CASE STUDY 01 – Tapovan Vishnugad Hydro Power Project

Client: NTPC | Contractor: Rithwik Projects

  • Work was severely affected by floods in 2013.
  • TBM stuck due to water ingress and squeezing soil.
  • Solution: Customized PU & Ureasilicate Grouting
  • Result: Advanced TBM by 52m, crossed 75% shear zone.
CASE STUDY 02 – Singoli-Bhatwari HEP

Client: Larsen & Toubro

  • 6000 LPM water ingress through plug foundation.
  • Applied sequential injection grouting with combination materials.
  • Successfully sealed ingress.
CASE STUDY 03 – Aaroli-Mumbra Tunnel, Mumbai

Client: MMRDA | Contractor: SMC

  • Tunnel affected by gushing water and poor rock strata.
  • Re-engagement using advanced injection grouting With Geo Resin.
CASE STUDY 04 – Soil & Slope Stabilization at Red Burn Oak Mussoorie

Client: Eicher | Contractor: DME

  • Issue: The Site has issue in Vertical & Horizontal Slope
    Solution: Rock Bolting with Resin and Cement Capsules.
    Formation of Curtain all around the Perimeter of the Building with Various Permutation of grouting techniques (Polymer Cement Slurry/ Georesins/Polyurethane etc)
  • Outcome: Project completed in 30 days
CASE STUDY 05 – Delhi Airport Metro Express

Client: NTPC | Contractor: Hindustan Co.

  • Water intrusion through shrinkage cracks and joints
  • Injection of hydrophobic PU resin
  • Result: 90%+ water leakage sealed in Phase 1
CASE STUDY 06 – Repair of Column Beam and slab Gurgaon

Client: Ramprastha Contractor: DME

  • Issue: Corrosion and cracks in Column, Beam & Slab. And Leakages in basement and Expansion Joint
  • Solution: Jacketing and MicroConcreting and Carbon Fiber Wrap in Column, Beam & Slab.
  • Leakage control in basement, waterman and expansion joint with various PU and geo resin combination.
  • Tested with complete satisfactory report.
CASE STUDY 07 – Ridge Reservoir Shimla

Client: Shimla Jal Parbandhan Nigam

  • Historic tank from 1924 with wall cracks
  • Applied silicate PU, epoxy, micro-concrete, polymer mortars
  • Prevented structural failure & restored utility
CASE STUDY 08 – Power Plant Rajasthan

Contractor: Navayuga Engineering

  • Leakages in underground concrete
  • Applied PU resin injection & foam formation for sealing